Asbestos surveys, testing and removal · North West England07517 806082
Free quote

Asbestos Air Testing and Monitoring

Air testing measures airborne asbestos fibres. We arrange background, leak, reassurance and four-stage clearance testing through an independent UKAS-accredited analyst.

07517 806082Free quote

  • UKAS-accredited lab analysis
  • Fixed written quotes
  • North West only
Asbestos Air Testing and Monitoring

Air Testing explained

Air testing pumps a measured volume of air through a filter, which is then counted under a microscope. It shows whether fibre levels are below the clearance indicator of 0.01 fibres per cm3.

It is used before work (background), during removal (leak and personal monitoring), after an accidental disturbance (reassurance) and at the end of licensed work (the four-stage clearance). Clearance certificates must come from an analyst independent of the removal contractor, and we arrange that for you.

Guide price: Background or reassurance tests from £250. Fixed written quote before any work.

When you need it

  • After someone has accidentally drilled or broken an asbestos material
  • At the end of licensed removal (four-stage clearance)
  • To reassure staff, tenants or parents after an incident
  • Before and during removal works
  • To check for leaks around an enclosure

What you get

  • Background and reassurance air tests
  • Leak and personal monitoring during works
  • Four-stage clearance via independent UKAS-accredited analyst
  • Written results and certificate
  • Advice on re-occupation

How it works

  1. AssessWe find out what was disturbed and where.
  2. Sample airPumps run in the affected rooms for a set time.
  3. CountFilters analysed by phase contrast microscopy.
  4. CertificateResults and clearance certificate where applicable.

Domestic, commercial and industrial air testing

Domestic

Homes: reassurance after a builder or DIY job disturbed something by mistake.

Commercial

Commercial: schools, offices and care homes needing proof that an area is safe to re-open.

Industrial

Industrial: monitoring during large removal projects and around live production areas.

Typical air testing jobs

  • Reassurance test after accidental drilling
  • Four-stage clearance after removal
  • Background air test before works
  • Leak testing around an enclosure
  • Personal monitoring for operatives
  • School classroom re-occupation test
  • Office floor reassurance test
  • Ceiling void disturbance check
  • Boiler room clearance
  • Post-flood or fire damage check

Standards and law we work to: HSG248 Asbestos: The Analysts' Guide; Control of Asbestos Regulations 2012.

Air Testing questions

What is a four-stage clearance?

Four checks by an independent analyst: that the job is complete and the site is in order, a thorough visual inspection inside the enclosure, air testing, and a final check once the enclosure has been taken down. It is required at the end of licensed work.

Do you do the clearance on your own removal jobs?

No. Clearances are always carried out by an independent UKAS-accredited analyst, as required by HSE guidance.

How soon can you test after an incident?

Leave the area, close it off and call us. We aim to arrange testing as quickly as possible, often the same or next day.

What reading is safe?

The clearance indicator is below 0.01 fibres per cm3 of air.

Need asbestos sorted? Talk to us today

Free advice by phone or WhatsApp. Fixed written quotes. North West only, so we get to you quickly.

Call 07517 806082 WhatsAppGet a free quote

Call WhatsAppQuote